Name
Interim Main Station
Client
Zech Bau SE
Program
Office
Location
Munich
Project
2024
Status
project
Parcel
–
Area
ca. 5.100 m2
Footprint
1.020 m2
On behalf of ZechBau SE, we developed a proposal for a temporary office and waiting building south of Munich Central Station.
The design proposed a modular construction system that, beyond economic efficiency, aimed to achieve a refined architectural scale and expressive quality. Through numerous 3D and physical concept models, the intention was to significantly exceed Deutsche Bahn’s relatively modest expectations regarding ´beauty` of architectural appearance. Ultimately, however, cost considerations prevailed in the general planner tender process.
Wir verwenden Cookies, um Ihr Surferlebnis zu verbessern, personalisierte Anzeigen oder Inhalte einzusetzen und unseren Datenverkehr zu analysieren. Wenn Sie auf “Alle akzeptieren” klicken, stimmen Sie der Anwendung von Cookies zu.