Name
P+R Facility
Client
Munich Building Department
Program
Car Park
Location
Munich
Project
1992
Status
completed
Parcel
–
Area
35.000 m2
Footprint
9.500 m2
The parking garage consists of two elongated structures (16.5 m × 210 m and 16.5 m × 186 m), which are offset from each other and separated by an 8.5-meter-wide central space that houses ramps and stairwells. This intermediate area allows for natural lighting and ventilation.
The nine parking levels, which are staggered half a story apart, provide space for 1,300 parking spots. The first parking level is located on the upper floor and is accessed via two double-helix ramps.
The area beneath the parking garage accommodates the bus station and 80 bus bays. A 120-meter-long glass suspension bridge connects the parking structure to the former train station, which was demolished and replaced by the Stadium Station in 2005.
Wir verwenden Cookies, um Ihr Surferlebnis zu verbessern, personalisierte Anzeigen oder Inhalte einzusetzen und unseren Datenverkehr zu analysieren. Wenn Sie auf “Alle akzeptieren” klicken, stimmen Sie der Anwendung von Cookies zu.